CHECA
Pricing

What it costs to build an ADU in Austin

An accessory dwelling unit is the cheapest way to add a real home to land you already own. Here is what ours cost, published per model, with nothing held back for a quote call.

The prices

A Checa ADU starts at $50,000 for the home itself. Once typical site work is added, the all-in range across our ADU models runs from $55,000 to $95,000.

Every one of these is a complete home: kitchen, full bath, HVAC, electrical and plumbing, finished and ready to live in. None of them is a shell.

ModelThe home, from
The AgaveStudio · 400 sq ft$50,000$55,000–$75,000 all-in
The Sage1 bd · 576 sq ft$55,000$60,000–$80,000 all-in
The Mesquite1 bd · 640 sq ft$60,000$65,000–$85,000 all-in
The Yaupon1 bd · 784 sq ft$65,000$70,000–$95,000 all-in

Priced June 2026

What your lot adds on top

The home price is fixed by the model. What varies is your lot, which is why we publish a band rather than a single number: a site allowance of 10% to 35% covers foundation, site work, utility connections and permits.

Five things move that allowance more than anything else, and all five are knowable before you commit: how much clay is in the soil, whether the ground is hydric, how steep the lot is, whether it sits in a flood zone, and whether municipal utilities already reach it.

FactorWhy it moves the number
Soil clay contentHigh-clay soils shrink and swell with moisture, so they demand a stiffer, more expensive foundation.
Hydric groundGround that holds water needs drainage work before anything is poured.
SlopeA flat pad is cheap. Every degree of grade adds excavation, retaining and drainage.
Flood zoneA mapped flood zone can require elevation, which changes the foundation and the insurance.
Utility accessMunicipal water, sewer and power at the property line are the cheap case. A long private run is not.

Why an ADU costs more per square foot than a house

A kitchen, a bathroom and a heating system cost roughly the same whether they sit in 400 square feet or 1,100. Spread over a small floor area, that fixed content pushes the per-foot number up.

Across our range the per-foot figure falls from $188 at the top end of the smallest home to $80 at the bottom end of the largest. The home is not getting cheaper to build; the fixed content is getting spread wider.

Questions
How much does an ADU cost in Austin?
A Checa ADU is $55,000 to $95,000 all-in, depending on the model and your lot. The home itself starts at $50,000; the rest is site work, foundation, utilities and permits.
Does the ADU price include the foundation?
Not in the home figure, which is the building itself. Foundation and site work sit in the site allowance, because what your ground demands is a property of your lot, not of the model. The all-in band includes a typical allowance for it.
How long does an ADU take to build?
Two to three days on site for our ADU models, because the panels arrive from the factory with windows, doors, wiring and plumbing already in them. Permitting and site preparation happen before that.